House

House

Progress continues with rain drain system and significant rock backfill. So far 60 trucks of rock, which is about 1.6 million pounds of rock. Once that tree garden is filled it should be a tad over 2 million pound of rock. The excavator crew thinks I should have invested in a quarry.

The conduit is for the service entrance. 3x 4″ conduits for primary power, and that should support 600 amps with no difficulty, and could grow to 800 or 1000amps.

Comments are closed.