It has begun!

For the curious – the lot we are building on has a set of 48 3 foot diameter concrete and rebar pillars that go 50 feet into the ground each. (Yes, that is a LOT of concrete and drilling). They were put in my the previous land owner as part of his house construction, as it was a house with a 40 foot cantilever design. The house was never started, but the pillars were installed. Some of the tops of the pillars are in the way of some of the footings, so we need to break apart the tops and then cut off the rebar (down a couple of feet) of some of them. That is the work in this video. 1 done, I think 10 more to go.