House

House

House Update – Some of the steel vertical posts were installed today. The second picture which shows the two posts at the very back of the shop give a good idea of how high up the first floor is, and how high the ceiling will be in the shop. It looks taller than it did on paper.

Tomorrow or Friday should bring some of the steel cross members.

A quick fly around:

Comments are closed.