House update – Pouring underway.
This morning we poured the shop floor, the lower rooms, and the upper garage floor. (~70 yards). Tomorrow AM we will pour the lower garage floor.
It will take most of the rest of today to do the finishing work on the floors poured.
The lower garage floor is interesting, as we are using these metal pieces called Combiforms that are laser set to get an exact slope from all four corners into the two drains. They are made by a Swedish company, and are used a bit more in Europe.
This is the 5th day of having a pump truck onsite during the build, so tomorrow should finish out the 6th and final pour, at least until we do flatwork next fall.