House

House

It has been a few weeks since I a new house update – Things slow down a little bit over the holidays, but things are still progressing. We decided to stain the ceiling wood before installing it, so over the holidays the painters took care of that, which was a good activity when less people are around as you have to wear a respirator when doing that kind of stuff.

The ceiling is getting the wood installed slowly, and that task should be done by the end of the week. Tile work has started in a few places, and the heated floor is awaiting city inspection.

My vault door arrived and was installed. It was a bit challenging only because of the mass. That door weighs about 1000lbs, so it takes some care to move it around.

The concrete pads around the side of the house were poured as well as the pad for the generator (which has buried conduit for the gas line and the electrical).

Comments are closed.