House

House

A few things are still moving along in the house construction. Some of the outside landscaping has been completed, including the trees in the tree garden. The drip system is installed and running, and the front entry way has been acid washed.

I have been slowing installing lights inside, so some rooms are now lit with the Z-Wave switches. Both stairs have been tread, and we are selecting the floor stain.

Scott Rowland is doing a kick ass job building a custom stainless steel and glass railing for the back deck, which will look super cool when it is done.

Comments are closed.