Install Complete – Panels
Solar Install Complete! 53 Panels installed, wired up, and microinverting. Of course the system is turned off as I wait for final inspection and PGE net meter install… but those 20kws of electrons are ready to go!
Solar Install Complete! 53 Panels installed, wired up, and microinverting. Of course the system is turned off as I wait for final inspection and PGE net meter install… but those 20kws of electrons are ready to go!
Racking for panels making progress. Tomorrow racking on main section on the upper roof, which will be the majority of the panels.
Solar Install, Day 1 underway!
20.14 kw. 53 LG panels, 380W each.
That is about 2400lbs total weight.
After Panels comes batteries!. .. and those weigh more I suspect.
I did a little power cord cleanup in my data room at home. Red cords on the A feed, black/yellow cords on the B feed… plus re did some networking. Looks better for sure!
I feel like these days when a box like this shows up I’m getting a box of gold bullion.