Exterior paint is perhaps 90% done, and interior drywall installation is about the same. The drywall guys are fast! >10,000 sq ft done in about 1.5 weeks, perhaps 8 guys. Next up is of course taping and mudding, then window/door trims, then probably the wood ceilings.

I think February is looking possible. Woot!