House
Roofing material partially installed. The higher roof is complete, and lower flat front area roof is next (with metal). Siding is underway, as is painting. Lots of rocks and dirt moved as well.
Roofing material partially installed. The higher roof is complete, and lower flat front area roof is next (with metal). Siding is underway, as is painting. Lots of rocks and dirt moved as well.