House
We passed the septic inspection, so the tanks and lines are getting covered, as well as some grading on the side slopes. Roofing material is on the roof, and the last major digging job is the stormwater tank that is being built.
We passed the septic inspection, so the tanks and lines are getting covered, as well as some grading on the side slopes. Roofing material is on the roof, and the last major digging job is the stormwater tank that is being built.