House

House

A few updated pictures as things progress. Exterior trim is getting fabricated and installed, some dirt moving has started to get the front driveway sorted, as well as the areas to the side of the house. Electrical has started with about 250 can lights to install, as well as about 130 outlets. HVAC is about 60% done, and plumbing about 60% as well.